Asphalt Plant
Applications: Highway Construction | Urban Roads | Airport Runways | Pavement Maintenance
Types: Stationary Batch | Mobile Batch | Drum Mix | Recycling Plant
Applications of Asphalt Mixing Plants
Types of Asphalt Plants
Stationary Asphalt Batch Plant
Designed for high-capacity, long-term road projects with precise screening and batch mixing.
Models: ALQ80, ALQ100, ALQ120, ALQ160, ALQ240, ALQ320, ALQ400
Mobile Asphalt Batch Plant
Wheel-mounted modular design for fast setup and easy relocation between job sites.
Models: ALYQ80, ALYQ100, ALYQ120, ALYQ160
Mobile Asphalt Drum Mix Plant
Compact, mobile continuous mixing plant ideal for small-to-medium quick paving tasks.
Models: ALYT20, ALYT40, ALYT60, ALYT80, ALYT100, ALYT120
Technical Parameters
| Model | ALQ80 | ALQ100 | ALQ120 | ALQ160 | ALQ240 | ALQ320 |
|---|---|---|---|---|---|---|
| Capacity | 80 t/h | 100 t/h | 120 t/h | 160 t/h | 240 t/h | 320 t/h |
| Cold Aggregate Hoppers | 4×7.5m³ | 4×7.5m³ | 5×7.5m³ | 5×12m³ | 5×12m³ | 6×15m³ |
| Dryer Size | φ1.5m×6.7m | φ1.65m×7m | φ1.8m×8m | φ2.2m×9m | φ2.6m×9.5m | φ2.8m×10.2m |
| Fuel consumption | 120-600kg / h | 150-1000kg / h | 150-1000kg / h | 150-1400kg / h | 180-1800kg / h | 260-2500kg / h |
| Vibrating Screen (Layer) | 4 layers | 4 layers | 5 layers | 5 layers | 5 layers | 6 layers |
| Mixer Capacity | 1000kg | 1250kg | 1500kg | 2000kg | 3000kg | 4000kg |
| Cycle Time | 45s | 45s | 45s | 45s | 45s | 45s |
| Filter Area | 420m² | 480m² | 550m² | 650m² | 1050m² | 1350m² |
| Asphalt Temperature | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ | 140-180 ℃ |
| Total Power | 300kw | 350kw | 380kw | 490kw | 670kw | 865kw |
| Model | ALYQ80 | ALYQ100 | ALYQ120 | ALYQ160 |
|---|---|---|---|---|
| Capacity | 80TPH | 100TPH | 120TPH | 160TPH |
| Mixer capacity | 1200kg | 1300kg | 1700kg | 2200kg |
| Mixing cycle | 45s | 45s | 45s | 45s |
| Gasoline Power(kW) | 63.5 | 104.5 | 125 | 157.5 |
| Coal Power(kW) | 86.5 | 127.5 | 169 | 205 |
| filter area | 420㎡ | 480㎡ | 510㎡ | 620㎡ |
| Courts Models | ALT20 | ALT40 | ALT60 | ALT80 | ALT100 | ALT120 |
|---|---|---|---|---|---|---|
| Capacity | 20 t/h | 45 t/h | 60 t/h | 80 t/h | 100 t/h | 120 t/h |
| Power | 34kw | 65kw | 105kw | 135kw | 170kw | 200kw |
| Cold Aggregate Hoppers | 3.5m³×1 | 4m³×4 | 4m³×4 | 6.5m³×4 | 6.5m³×4 | 6.5m³×4 |
| Finished Aggregate Storage Bin | 2 m³ | 2.5 m³ | 4.5 m³ | 5 m³ | 7 m³ | 7 m³ |
| Asphalt Temperature | 120-180 ℃ | |||||
| Fuel consumption | 13-15kg/t | |||||
| Asphalt Tank | 10 m³ | 20 m³ | 30 m³ | 30 m³ | 35 m³ | 35 m³ |
| Control room | 2.2m | 2.2m | 3m | 3m | 3.5m | 3.5m |
| Option | Bag dust filter/water dust filter | |||||
| Model | ALYT20 | ALYT40 | ALYT60 | ALYT80 | ALYT100 | ALYT120 |
|---|---|---|---|---|---|---|
| Output | 20t/h | 45t/h | 60t/h | 80t/h | 100t/h | 120t/h |
| Power | 34kw | 65kw | 105kw | 135kw | 170kw | 200KW |
| Cold Aggregate Feeding System | 3.5m³×1 | 4m³×4 | 4m³×4 | 6.5m³×4 | 6.5m³×4 | 6.5m³×4 |
| Finihsed Asphalt Storage Bin | 2m³ | 2.5m³ | 4.5m³ | 5m³ | 7m³ | 7m³ |
| Asphalt Temperature | 120-180℃ | 120-180℃ | 120-180℃ | 120-180℃ | 120-180℃ | 120-180℃ |
| Fuel Consumption(Fuel Oil) | 5-7.5kg/t | 5-7.5kg/t | 5-7.5kg/t | 5-7.5kg/t | 5-7.5kg/t | 5-7.5kg/t |
| Fuel Consumption(Burning Coal) | 13-15kg/t | 13-15kg/t | 13-15kg/t | 13-15kg/t | 13-15kg/t | 13-15kg/t |
| Asphalt Tank | 10m³ | 20m³ | 30m³ | 30m³ | 35m³ | 35m³ |
| Option | bag dust collector / water dust collector | |||||
| Whole Plant Option | whole mobile / semi-mobile / fixed | |||||
| Parameter | AZS1000 | AZS1500 |
|---|---|---|
| Rated production capacity (t/h) | 80 | 120 |
| Feeder belt width (mm) | 600 | 600 |
| Number of cold material bins | 2 | 2 |
| Volume of cold material bin (m³) | 10 | 10 |
| Elevator capacity (t/h) | 100 | 140 |
| Drying drum specifications (diameter × length) (mm) | ϕ 2050×7200 | ϕ 2220×9500 |
| Weighing hopper volume (t) | 1 | 1.5 |
| Note for Rated Production Capacity: | The rated production capacity is defined under standard operating conditions, which refer to: Ambient temperature: 20°C Standard atmospheric pressure RAP material: crushed granular material or milled material Average moisture content: 5% Heating temperature of recycled material: 120°C |
|
Asphalt Plant Projects
Key Features of Asphalt Mixing Plants
Precise Bitumen & Powder Weighing
High-precision load cells and dynamic error compensation ensure exact bitumen-aggregate ratios and consistent hot mix quality.
High-Efficiency Drying Drum
Optimized internal flight design combined with low-emission burners guarantees rapid heating, high thermal efficiency, and lower fuel consumption.
Intelligent PLC Control System
Fully automated PLC control with touch-screen interface, real-time formula management, and remote diagnostic capabilities for effortless operation.
Accurate Vibrating Screen
High-efficiency multi-deck vibrating screen precisely segregates hot aggregates to eliminate mix contamination and guarantee asphalt performance.
Advanced Eco Dust Collection
Two-stage dust filter system with primary cyclone and secondary baghouse ensures dust emissions meet strict environmental standards.
Comprehensive Safety Protection
Equipped with emergency stop switches, interlocking safety guards, and flameout protection to safeguard operators and machinery.
Comprehensive Service & Support
Spare Parts Supply
A comprehensive spare parts inventory covers mixer wear liners, burner nozzles, filter bags, drying drum flights, valves, and other essential components.
Expert Technical Support
Our experienced technical team supports asphalt plant design, installation, troubleshooting, and maintenance, with online and on-site assistance.
24/7 After-Sales Service
Our after-sales team is available 24/7 to answer questions and provide online or on-site support throughout your equipment’s service life.
Find the Right Asphalt Mixing Plant
Looking for a suitable asphalt mixing plant for your project? Tell us your required production capacity, application, and site conditions. Our team will help you explore suitable options and find the right solution for your needs.